Weather Alert Day

I-180 Work Rescheduled

By: 10/11 News Email
By: 10/11 News Email

Lincoln, NEB - Weather permitting, a fog seal project that was scheduled for August 27 is now set for September 3 on I-180 in Lincoln, according to the Nebraska Department of Roads. A fog seal is oil sprayed onto the surface of a newer road to seal the fine cracks.

State maintenance forces will be doing a fog seal from Reference Post 0 to Reference Post 1.6. All lanes in both directions will be closed Wednesday night at 6:00 p.m. from Fletcher Avenue to US-6 (Cornhusker Highway) until Thursday morning at 6:00 a.m.

From the east and north, motorists may access downtown using 27th and 56th Streets. From the west and northwest, use Interchange 399 on Cornhusker Highway to I-180.

Message boards will be used. The work is anticipated to take one night. Motorists should expect to see delays and are reminded to drive cautiously through highway work zones.

KOLN-TV Call: (402) 467-4321 Toll-free: 1-800-475-1011 840 North 40th Lincoln, NE 68503 Email: KGIN-TV Call: (308) 382-6100 123 N Locust Street Grand Island, NE 68802 Email: KSNB-TV Toll free 888-475-1011 123 N. Locust St. Grand Island, NE 68802 Email :
Copyright © 2002-2015 - Designed by Gray Digital Media - Powered by Clickability 272707891 -
Gray Television, Inc.